Alternatively, motorists can use 9th Street to Mountain Avenue to access the WB I-10 on-ramp at Mountain Avenue. Motorists can access the WB I-10 loop on-ramp at Euclid Avenue via a new extended left-turn only lane approaching 8th Street to 7th Street – lanes are shifted to the west to create this new left-turn only lane. On Sunday, May 22 at 9:00 p.m., the westbound (WB) I-10 on-ramp from southbound (SB) Euclid Avenue closed. EB I-10 approaching Monte Vista Avenue to 4th Streetįor more information, please read the Lane Configuration Notice.WB I-10 approaching Euclid Avenue to Central Avenue.The new configurations began in early August at the following locations: To improve the driver experience, there is enhanced lane striping in these areas. ![]() This configuration is needed to ad vance construction, install toll equipment, and provide safe, dedicated work zones. Westbound and Eastbound I-10 Lane Configuration ChangesĪs construction continues on the SB Express Lanes, the I-10 freeway lanes were reconfigured in select areas on the westbound and eastbound freeway. Click here Interactive project map to learn more about the bridges. ![]() The lanes will be available to HOV 3+ vehicles at a discount, In addition, lanes to assist drivers getting on and off the freeway (auxiliary lanes) are being constructed in selected locations.Įighteen bridges throughout the corridor will either be replaced, widened, or improved to accommodate the widening of the freeway. The third and final future phase of 12 miles will be from Pepper Avenue to Ford Street in Redlands.įor the Phase 1 project, a single new lane is being constructed and combined with the existing HOV lane to provide two tolled express lanes in each direction. The second phase, stretching 11.1 miles from I-15 to Pepper Avenue in Colton, is in design and the final funding components are being sought to enable construction to begin in 2024. The first phase, stretching 10 miles from the Los Angeles County line to I-15, is currently under construction. The eastbound 10 Euclid Avenue off-ramp also will be closed with detour routes posted.SBCTA’s Interstate 10 Corridor Project is comprised of three phases of improvements to benefit the movement of both people and goods on this facility that is important to both San Bernardino County residents and to the local and national economy. 2, at 5 a.m., two right lanes will be closed on the eastbound 10 approaching the eastbound Euclid Avenue off-ramp in Ontario for about 1/4 mile. Detour routes will be posted.īeginning Friday, Sept. The eastbound 10 Freeway’s Monte Vista Avenue on-ramp and westbound Monte Vista Avenue on- and off-ramps also will be closed. 18, at 5 a.m., Monte Vista Avenue in Montclair under the 10 is scheduled to close for work. ![]() The westbound 10 Freeway Euclid Avenue loop on-ramp is set to close Tuesday, Sept. The off-ramp will stay closed until Friday, Sept. 12, when the eastbound 10 Freeway’s Euclid Avenue off-ramp in Ontario closed at 6 a.m. Construction on the Express Lanes project is about 75% complete, according to the San Bernardino County Transportation Authority.Ĭlosures began Tuesday, Sept. Work on the 10 Freeway is making way for the addition of toll lanes. Drivers on the 10 Freeway between Montclair and Ontario can expect more closures over the next two weeks as construction continues on the I-10 Express Lanes project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |